91久久精品一区二区三区色欲|成人综合亚洲日本一区二区|在线中文AV播放网站|欧美性爱亚洲性爱

OA
CN

Danger elimination and reinforcement project of key (II) reservoir in Duchang County

Danger elimination and reinforcement project of key (II) res...
Danger elimination and reinforcement project of key (II) reservoir in Duchang County,the total construction period is 165 days and the total investment is 2814399.28 Yuan.

The Renovation project from Binjiang hotel to Guantang section of Guanyang Town, Guanyang County, Guilin city

The Renovation project from Binjiang hotel to Guantang secti...
The Renovation project from Binjiang hotel to Guantang section of Guanyang Town, Guanyang County, Guilin city is located in the urban area of Guanyang County, with a total construction period of 30 days and a total investment of 18132288 Yuan.

Small Hydropower station in Anhua County, Hunan Province

Small Hydropower station in Anhua County, Hunan Province
Small Hydropower station in Anhua County, Hunan Province.

High standard farmland construction demonstration project of agricultural comprehensive development in Nanchang County in 2011

High standard farmland construction demonstration project of...
The total construction period of high standard farmland construction demonstration project of agricultural comprehensive development in Nanchang County in 2011 is 120 days and the total investment is 3675699.44 Yuan.

Yichun Shanggao County in 2011, 40 small reservoirs reinforcement project

Yichun Shanggao County in 2011, 40 small reservoirs reinforc...
Yichun Shanggao County in 2011, 40 small reservoirs reinforcement project, with a total investment of 4144142.57 Yuan.

Longtan Hydropower Station in Guangxi Province

Longtan Hydropower Station in Guangxi Province
As the "West-to-East Power Tansmission" landmark project and the key project of the western development,Longtan Hydropower Station is the second largest hydropower station in China following the Three Gorgers Hydropower Station. The design water level is 400 meters, the dam height is 216.5 meters, the dam crest length is 836 meters, the storage capacity is 27.3 billion cubic meters, the installed capacity is 6.3 million kilowatts, and the annual power generation capacity is 18.7 billion kilowatt-hours.
目前在第1頁, 共有1頁, 共有6條記錄 第一頁 上一頁 1 下一頁 最后一頁 跳轉(zhuǎn)到
信阳市| 承德市| 临高县| 根河市| 靖安县| 嘉峪关市| 仁化县| 遂昌县| 北安市| 桃江县| 郯城县| 七台河市| 隆德县| 都兰县| 新津县| 青川县| 北京市| 昌乐县| 祁东县| 昌吉市| 辽阳县| 彭山县| 简阳市| 肥城市| 雅安市| 郸城县| 宁海县| 五华县| 谷城县| 黄冈市| 长阳| 汉源县| 富锦市| 安顺市| 改则县| 西城区| 托克托县| 淳化县| 枝江市| 奉贤区| 宝坻区|